Products / Jobsite

Block 15

Block 15 can be easily integrated onto a suitable trailer platform, connects in minutes, and runs alongside or in place of diesel generation on small sites, events and temporary grid work.

Block 15 unit
BLOCK 15 / JOBSITE · COMPACT BESS
01Specification

The numbers

Rating15 kW / 33 kWh
FormatCompact BESS
DeploymentTrailer-mountable; place and energize
ParallelingUp to 6 units
DutyTemporary site power, DG offset
IngressIP54
SPECBLOCK 15 · PROVISIONAL · CONFIRM AGAINST CONTROLLED DATASHEET
Block 15 secondary view
BLOCK 15 / SECONDARY VIEW
02Engineering

Why it's built this way

Transportable

Compact and transportable, Block 15 can be moved between sites using a suitable trailer platform.

Fleet paralleling

Up to six Block units operate in parallel as load grows.

DG offset

Runs alongside or in place of diesel generation on temporary sites.

USEApplications

Construction sites · events · temporary grid support · utility works

Size it from your meter.

Every Block deployment starts with the PKE dispatch study: data first, hardware last.